A project's value is determined before it reaches the site, not on it.
BEZMIALEM NEW HOSPITAL PROJECT · BEZMIALEM VAKIF UNIVERSITY · 2017-2025
Küçükbakkalköy Mahallesi, Selvili Sk. No: 4
İç Kapı No: 20, Ataşehir / Istanbul, Türkiye
+90 506 351 04 09 · info@baysaryapi.com
ABOUT
BAYSAR is a construction and engineering company built on more than 20 years of site and management experience.
Our founder, Bayram Saraçoğlu, holds a civil engineering degree from Boğaziçi University, an MBA from Istanbul University and a PMP certification. Over his career he has worked on projects exceeding 1.2 million m²: industrial facilities, hospitals, hydroelectric and solar power plants, mosques, housing and mixed-use urban developments. That experience did not accumulate in a single stage but across the whole of the work. From the technical office to tendering, from cost control to the site.
He spent the first seven years of his career on the contractor side. From 2012 onwards he moved to the developer and client side: running zoning processes, preparing tender packages, developing a 280,000 m² university hospital through to tender, and then managing its construction.
SERVICES
FOUNDER
He spent the first seven years of his career on the contractor side: technical office, planning, cost control, site. In 2012 he crossed to the other side of the table. Since then he does not build projects; he makes them buildable.
Bayram Saraçoğlu
Civil Engineer · Founder
PROJECTS
Bezmialem Vakıf University Solar Power Plant
Land identification, obtaining the grid connection call letter, development of preliminary and detailed design, energy simulations, feasibility studies, an…
13,65 MWe 19.11 MWp INSTALLED CAPACITY | 12 M$ | CLIENT: Bezmialem Vakıf University | EMPLOYER AT THE TIME: Bezmialem Vakıf University
Bezmialem Vakıf University New Hospital Development
Land development, zoning plan amendments, subdivision and consolidation, preparation of the user requirement brief, commissioning and evaluation of prelimi…
280.000 M² GROSS FLOOR AREA | 300 M$ | CLIENT: Bezmialem Vakıf University | EMPLOYER AT THE TIME: Bezmialem Vakıf University
KAT Ataköy Project Development
Development of a mixed-use urban project combining residential, retail, hotel and mosque functions.
492.000 M² PROJECT AREA | [BUDGET TO BE ENTERED] | EMPLOYER AT THE TIME: Eksim Yatırım Holding
OTTOMARE Project Development
Development of a residential and retail project. A single seafront block.
58.000 M² PROJECT AREA | [BUDGET TO BE ENTERED] | EMPLOYER AT THE TIME: Eksim Yatırım Holding
Bezmialem Vakıf University New Hospital, Phase 1 Construction
First phase construction of the hospital we developed and tendered. Site works, supervision, monthly progress payment control and coordination of all engin…
101.000 M² GROSS FLOOR AREA | 160 M$ | CLIENT: Bezmialem Vakıf University | EMPLOYER AT THE TIME: Bezmialem Vakıf University
Biotechnology Institute Restoration Project
Development of the restoration project, determination of system decisions, management of the design process and supervision of site works.
4.200 M² INDOOR + 20,000 M² LANDSCAPE | 4.65 M$ | CLIENT: Bezmialem Vakıf University | EMPLOYER AT THE TIME: Bezmialem Vakıf University
Bezmialem Vakıf University Auditorium
Project development, determination of system decisions, management of the design process, supervision of site works and coordination of all engineering dis…
6.500 M² GROSS FLOOR AREA | 2.34 M$ | CLIENT: Bezmialem Vakıf University | EMPLOYER AT THE TIME: Bezmialem Vakıf University
Marmara Theology Mosque Complex
Project management of a religious and cultural complex. The mosque opened for worship on 23 October 2015.
21.000 M² GROSS FLOOR AREA | 28.2 M$ | CLIENT: Marmara University | EMPLOYER AT THE TIME: Eksim Yatırım Holding
Semerkant II Housing Project
Construction progress monitoring and project management of a housing development. Four-month assignment.
30.000 M² PROJECT AREA | 25 M TL | EMPLOYER AT THE TIME: Deniz Yapı
Emsey Hospital
Process management and project management of a hospital development. Four-month assignment.
31.000 M² PROJECT AREA | 85 M TL | EMPLOYER AT THE TIME: Deniz Yapı
Temelli TOKİ Commercial Centre and Akyurt TOKİ Mosque
As site manager, responsible for site teams, budget and technical operations.
6.620 M² AREA | 1.75 M$ | CLIENT: TOKİ (Housing Development Administration) | EMPLOYER AT THE TIME: MKS Proje İnşaat
Kaletepe Hydroelectric Power Plant, Erzurum
Construction processes as technical office engineer, planning and cost control engineer, and site engineer.
10,68 MW INSTALLED CAPACITY | 30 M$ | EMPLOYER AT THE TIME: KAYI İnşaat
IKEA Shopping Centre, Samara / Russia
Technical office, planning and cost control engineering on an international retail development.
220.000 M² PROJECT AREA | 130 M$ | CLIENT: IKEA | EMPLOYER AT THE TIME: KAYI İnşaat
Arçelik Factory Campus
Technical office, planning-cost control and site engineering on the construction of an industrial facility.
75.000 M² PROJECT AREA | 60 M$ | CLIENT: Arçelik | EMPLOYER AT THE TIME: KAYI İnşaat
The images belong to the projects our founder worked on and remain the property of their respective clients, developers and architects. They are used here solely to illustrate the scope of that work.
CONTACT
Generated on 28.07.2026 from baysaryapi.com.
The current version is always available on the website.
Design and development: Emixhas